Name: Michael "Mike" Sisemore 870-351-3675 Email: sisemoremike@yahoo.com Languages:(English, French, Russian) PROFILE v Project Lead Scheduler with experienced working ability to
build complex construction schedules & challenge general contractor's
schedules in working in the Oil, Gas, Chemical/Petrochemical/Commercial
Industry and overseas experience in international locations and diverse
cultural environments. EPC-Engineering,
Procurement, Construction-Front End
Engineering Design phase-Pre-Feed/Feed engineering experience in Execution/Commissioning phase projects.
Pre-Feed/FEED divided into separate packages
covering different portions of the project & procure all the
equipment and materials necessary, and then construct to deliver a
functioning facility. Track and update
Owner clients' milestones and processes not updated by contractor.
Experience in creating & developing project schedule from cradle to grave
& monitor schedule slippage & cost. Prepares and manages overall
master project schedule integrating the project Work Breakdown Structure
using an appropriate scheduling software package. Coordinates schedule from
multiple contractors and incorporates the information gathered into the
overall project master schedule to execute and
deliver the project within an agreed time and budget, Report
slippages against project baseline and advise potential impact on project
critical activities. Reviews, monitors and control the Contractor(s) EPC
schedules for all project activities for logic, level of detail, interfaces,
etc. (e.g., Level 3, Level 4, short-term-3 wk look-ahead schedules). o
Monitors
and forecasts progress of activities in contractors’ work schedules.
Highlights problem areas and recommends remedial actions attend daily/weekly
meetings with client and local contractors and to prepare reports for
management levels. Evaluate general contractor
schedule for viability, health and constructability. Ensure schedule matches
other tracking sources and field progress. Be able to challenge (or otherwise
defend schedules as appropriate.) Develops detailed Gantt or PERT charts. o
Evaluates
critical paths in the project schedules and evaluate alternative schedule
options to identify optimum project strategies or resolve problems before and
during execution. o
Performs
probabilistic analysis of completion dates and potential alternatives.
Presents risk based analysis of most likely completion and expected deviation
range. o
Provide
baseline analysis and acceptance of Critical Path Schedule including
reforecasting of baseline o
Provide
continued analysis of critical activities and longest path activities o Responsible for performing Monte Carlo
schedule simulation for periodic evaluation of schedule, Proficient in cost, manpower and equipment resource loaded
schedule. PROFESSIONAL
EXPERIENCE Sr Scheduler Planner Dec 2014 –Nov 2015 VOESTALPINE TEXAS LLC - Portland, TX o
This role was responsible for progress against work process
milestones, identifying performance gaps, taking action
to mitigate gaps and escalating issues when
warranted an over seeing all aspects of the
Levels. Working with the project's managing departments including
engineering, procurement, subcontracts, fabrication, Installation and
construction, Integration during detailed planning sessions interpreting the
results of the planning sessions and convert the plan into a WBS structured
schedule that can be man loaded. New plant project
Sr Scheduler/Turnaround Planner
Aug 2014 –Nov 2014
Catalyst Plant Turnaround/Expansion-WG-Mustang- Shreveport, LA This Senior role participates in cross-functional Planning Team
responsible for progress against work process milestones, identifying
performance gaps, taking action to mitigate gaps and escalating issues when
warranted an over seeing all aspects of the Levels. Working
with the project's managing departments including engineering, procurement,
subcontracts, fabrication, Installation and construction, Integration during
detailed planning sessions interpreting the results of the planning sessions
and convert the plan into a WBS structured schedule that can be man loaded
from the estimate Construction also cover data
centers, cleanrooms, and large MEP systems. Mustang need extra
scheduler for a couple months because Honeywell had too many project to cover
and want someone to get the construction phase started so they could caught
up on the expansion project.
Lead Scheduler/Turnaround
Jan 2014 – July-2014
Ammonia Plant Turnaround/Expansion-KBR-Kanas City, MO This role was responsible for progress against work process
milestones, identifying performance gaps, taking action to mitigate gaps and
escalating issues when warranted an over seeing
all aspects of the Levels. Working with the project's managing departments
including engineering, procurement, subcontracts, fabrication, Installation
and construction, Integration during detailed planning sessions interpreting
the results of the planning sessions and convert the plan into a WBS
structured schedule that can be man loaded from the estimate. $1.3bn KBR
need another schedule to catch the scheduling up for three shut downs and new
construction plant expansion. Work from B/V offices in Kansas City and Koch
in Enid, Ok Topsides Planning/Scheduling Engineer Sept 2010 – Dec 2013 (Fircroft) Chevron-Jack & St Malo, massive floating semi-submersible production
facility– Offshore Platform-Hull build in Samsung
yard-Korea, Modules Build in Kiewit
yard Ingleside, TX. Construction also cover data
centers, cleanrooms, and large MEP systems. Primarily responsible for
the Topsides planning and scheduling deliver
the successful outcome of the planner. This role participates in a
multi-discipline, cross-functional Planning Team responsible for progress
against work process milestones, identifying performance gaps, taking action
to mitigate gaps and escalating issues when warranted an overseeing
all aspects of the Level, seconded to Owner-Chevron). Project completed Topsides Planning/ Scheduling Engineer Dec 2008 - Aug
2010 Gazprom-Prirazlomnaya
offshore ice-resistant fixed platform (MOSS
CS-50 MkII (project 2958) offshore topsides-
build in Sevmash military shipyard Severodvinsk, Russia.
Construction also cover data centres,
cleanrooms, and large MEP systems. Primarily responsible for the
Topsides planning and scheduling deliver the
successful outcome of the project This role participates in a
multi-discipline, cross-functional Planning Team responsible for progress
against work process milestones, identifying performance gaps, taking action
to mitigate gaps and escalating issues when warranted an overseeing
all aspects of the Level. Seconded to Owner-Gazprom). Able to put work-packages together after estimate and
plan in a schedule for resource loading and estimates. Project completed Turnaround Petro-Chemical Planning/ Scheduling Sept 2008 - Dec 2008 BP-Texas City,
TX. Refinery Expansion Working closely with the maintenance turnaround
scheduler to integrate project work scope into detailed resource loaded
turnaround schedules. Providing detailed material sheets for each job
package. Inputting job steps for all resources into the planning tool
including operations, third parties, and outside contractors. Responsible for
driving the work scope development for assigned turnarounds,& providing
field duration estimates (norms) for assigned turnarounds, providing safe and
accurate execution plans and schedules for assigned turnarounds, leading and
coordinating planning and schedule update and reporting status, Initiate and maintain
purchase requisition for all service vendors, Applying refining experience
including maintenance associated with all pipe fitting, boilermaker, welding,
scaffolding, insulation, and laborer crafts for execution activities. Issuing
and tracking pre-shutdown fabrication work excluding capital projects.
Coordinates logistics, document controls, and the Job Change Order process,
Integrate Goal Zero philosophies and Environmental Stewardship into planning,
scheduling and execution activities. Audit TA plans and schedules ensuring
that each plan and schedule is properly reviewed and gaps closed before
execution Primarily responsible for the refinery planning and scheduling deliver the successful outcome of the refinery.
This role participates in a multi-discipline, cross-functional Planning Team
responsible for progress against work process milestones, identifying
performance gaps, taking action to mitigate gaps seconded to Owner-
BP). Need extra scheduler for couple months, scheduler was behind on
project. LNG
Planning/Scheduling Jan 2006 – Aug 2008 Takula Gas
Processing Platform (TGPP) Project fabrication
of the jacket, and flare boom in Lobito, Angola, and topsides fabrication in
Korea, and installation work in February/March 2008. TGPP is a single-train
facility designed as a 5,000-metric ton, single-lift modular deck with
facilities to process approximately 100 million standard cubic feet per day
(scf/d) of sour gas for injection and storage
tanks and an LNG export terminal-AMEC- seconded to Owner-Chevron). Able to put work-packages together after estimate and
plan in a schedule for resource loading and estimates. LNG Planner / Scheduling June 2003 –
Dec 2005 ConocoPhillips-Darwin
LNG is a single train facility Bayu-Undan field to the plant at Wickham Point, Darwin, Australia Construction
also cover data centres, cleanrooms, and
large MEP systems. LNG primarily responsible for the planning and
scheduling deliverables for a single block or a multi-block TA at the site
and leads a team of TA planners to deliver the
successful outcome of the LNG planner to oversee Fabrication
Contractor Schedules and build a detailed integrated Onshore Commissioning
and Fabrication/Installation Construction Schedule. (Seconded to Owner-
Bechtel) Able to put work-packages together after estimate and plan in a
schedule for resource loading and estimates. Pipeline
Planning/ Scheduling Engineer Jan
2001 – June 2003 Sakhalin
Energy Trans-Sakhalin pipeline
system- 300 km of offshore and 1,600 km
of onshore multi-phase oil and gas pipelines.
Primarily responsible for the Petrochemical
planning and scheduling deliver the successful
outcome of the
Planner. This role participates in a multi-discipline,
cross-functional Planning Team responsible for progress against work process
milestones, identifying performance gaps, taking action to mitigate gaps and
escalating issues when warranted an overseeing all
aspects of the Level scheduling. Pre-Feed/Feed engineering experience in
phase two projects. Prigorodnoye, Russia Petrochemical
Planner / Scheduler-Turnaround June 1997 – Dec 2000 Expansion
Project Sulphuric Acid Plant at Saudi Aramco/Shell Jubail refinery in
Saudi Arabia. Working with
the project's managing departments including engineering, procurement,
subcontracts, fabrication, and construction during detailed planning sessions
interpreting the results of the planning sessions and convert the plan into a
WBS structured schedule that can be man loaded from the estimate bid. Seconded to
Owner-Saudi Aramco). LNG Planner /
Scheduler May-1992/1997-
(1st & 2nd phases) PETRONAS' LNG
Complex, Malaysia LNG Dua Sdn Bhd (Trains 4, 5, 6), No1 Malaysia LNG Tiga Sdn
Bhd (Trains
7 and 8), No 2 build on-site. Owner-PETRONAS Responsibilities
include LNG/Pipeline planner
overseeing all aspects of the Level (P3, & MS Projects) Working with the
project's managing departments including engineering, procurement,
subcontracts, fabrication, and construction/Installation during detailed
planning sessions interpreting the results of the planning sessions and
convert the plan into a WBS structured schedule that can be man loaded from
the estimate TECHNICAL/COMPUTER SKILLS: MS Office tools, Word, Excel, PowerPoint, Microsoft Access database creation, Table Analyzer
Wizard, Adobe, Bluebeam, Synchro,
NetPoint & background in Earned Value Management System (EVMS) and
familiar with spreadsheets and other standard Microsoft software.
SharePoint software. Skilled in versions-Primavera P6-R8.3 & Primavera Risk Analysis-Visio & Project
Server 2013.Monte Carlo analysis-PERT.
Experience with project business activities including: Manpower budget: Oracle and Budget Integrator, Deltek Acumen
Risk & Schedule Analysis Enterprise. Knowledge in Viewpoint, DeltaV System, Smartsheet,
SureTrak and ARES Prism (cost) Ecosys EPC.
Planning
and Scheduling Professional (PSP) Certification
Transportation
Worker Identification Credential (TWIC) card. EDUCATION: v
College: École
Polytechnique Palaiseau,
France v
MSME-Master Degree in Mechanical
Engineering
v
MILITARY: Served-SSgt in
3rd Reconnaissance Battalion, 3rd Marine Division; III Marine Expeditionary Force, Company B (Vietnam) UNITED STATES MARINE CORP Camp Schwab, Okinawa-Japan |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
French |
Fluent |
|
|
Russian |
Intermediate |
|
|
Spanish |
Fluent |
|
|
|